地学前缘 ›› 2019, Vol. 26 ›› Issue (4): 138-145.DOI: 10.13745/j.esf.sf.2019.7.7

• 大数据算法研究 • 上一篇    下一篇

耦合PCA-SVM算法的金矿矿床规模预测分析研究

刘承照,韩帅,李明超,朱月琴   

  1. 1. 天津大学 水利工程仿真与安全国家重点实验室, 天津 300354
    2. 中国地质调查局 发展研究中心, 北京 100037
    3. 自然资源部地质信息技术重点实验室, 北京 100037
  • 收稿日期:2018-09-21 修回日期:2019-05-27 出版日期:2019-07-25 发布日期:2019-07-25
  • 通讯作者: 李明超(1979—),男,教授,博士生导师,水利水电工程专业。
  • 作者简介:刘承照(1995—),男,硕士研究生,水利水电工程专业。
  • 基金资助:
    天津市杰出青年科学基金项目(17JCJQJC44000);国家优秀青年科学基金项目(51622904);国家重点研发计划项目(2016YFC0600510)

Prediction and analysis of gold deposit sizes based on coupled PCA-SVM algorithm

LIU Chengzhao,HAN Shuai,LI Mingchao,ZHU Yueqin   

  1. 1. State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300354, China
    2. Development Research Center of China Geological Survey, Beijing 100037, China
    3. Key Laboratory of Geological Information Technology, Ministry of Natural Resources, Beijing 100037, China
  • Received:2018-09-21 Revised:2019-05-27 Online:2019-07-25 Published:2019-07-25
  • Supported by:
     
 

Abstract: Identification of ore deposit types is an important part of mineral exploration. Traditional methods for predicting deposit size are time-consuming, laborious and costly. In order to improve prospecting efficiency and accuracy and reveal potential relation between chemical composition and the size of gold mineralization, we propose here an integrated approach using the Principal Component Analysis (PCA) and Support Vector Machine (SVM) algorithms. In this approach, we first extract the major features of samples using PCA, and we then train a set of SVM classifiers by these features to predict deposit sizes. In this study, we collected and analyzed 3812 gold mine samples from Beishan, Gansu region to establish a PCA-SVM model with the training accuracy of 92.3% and the test accuracy of 88.7%, which were 14.3% and 17.1% higher, respectively, than using SVM. We demonstrated that the PCA-SVM method not only can eliminate subjective factors, but also can improve the accuracy of identifying ore deposits as well as prospecting efficiency, thus to provide reliable support for decision making.

Key words: gold deposits, size prediction, Principal Component Analysis (PCA), Support Vector Machine (SVM), coupled algorithm

中图分类号: